Thanks for visiting BtownBanners.com!  We noticed you have AdBlock enabled.  While ads can be annoying, we utilize them to provide these forums free of charge to you!  Please consider removing your AdBlock for BtownBanners or consider signing up to donate and help BtownBanners stay alive!  Thank you!

Sign in to follow this  
RBB89

Assembly Hall renovation: August

Recommended Posts

Construction crews have completed 14 months of work at the future site of Simon Skjodt Assembly Hall.

Progress in May included East Corridor Terrazzo vitrification, completion of the north ADA slab, wood flooring replacement, and setting of the South Mechanical Room Air Handlers. Miscellaneous work still in process includes the mechanical, electrical, and plumbing installation, interior painting, Spirit of 76 Club concrete seating, acoustic cielings, and North Bleacher modifications. Also in progress is the high roofing, escalator pits, and the elevator.

This month, they will be fireproofing the balcony level, re-installing the North Bleachers, continuing to vitrificate the Terazzo, and completing the concession renovations. The upcoming milestones for this project include completing the concourse restrooms by July, and the punch list in August.

From iuhoosiers.com

Share this post


Link to post
Share on other sites

May need to zoom in...things are starting to get cleaned up. The pic on the right shows the new stair well in the south lobby. Escalators will surround it. There will be two sets of this set up in that lobby. The north will still have ramps, but with new escalators too. The new elevator (a total of 3) is being installed as well.ImageUploadedByBtownBanners1466166976.983745.jpg

Share this post


Link to post
Share on other sites
I'm anxious to see what the light is like coming through the glass on the south side. Surely that won't effect a day game right?

Sent from my iPhone using BtownBanners

I'm sure there are people getting paid lots of money to think of that stuff. Besides, only the bottom half of the south wall will have light coming through, as the top half will be enclosed into a club area. And then you have the lobby filtering some of it.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×